Posts

Wind Load Calculation per ASCE 7: Velocity Pressure, Gust Factor and Design Wind Pressure Worked Example

Image
Wind often governs lateral design and roof uplift on steel industrial buildings, yet the ASCE 7 procedure is easy to misapply when editions mix. This post answers three common questions, then works an example for a steel-frame building. It extends our overview of structural engineering for industrial plants . Steel-frame building under construction. Photo: Dwight Burdette, CC BY 3.0, via Wikimedia Commons . What is the formula for calculating wind load? For a building, the design wind pressure on a surface is p = q G Cp − qi (GCpi), and the force is F = p × A, where A is the tributary area. The velocity pressure follows from wind velocity: qz = 0.00256 Kz Kzt Kd Ke V² in psf with V in mph, or qz = 0.613 Kz Kzt Kd Ke V² in N/m² with V in m/s. Kz is the height exposure coefficient, Kzt the topographic factor, Kd the wind directionality factor, Ke the ground elevation factor (ASCE 7-16 onward), G the gust factor (0.85 for rigid buildings) and Cp the external pressure coefficient. Th...

Wind Load Calculation per ASCE 7: Velocity Pressure, Gust Factor and Design Wind Pressure Worked Example

Image
Wind often governs lateral design and roof uplift on steel industrial buildings, yet the ASCE 7 procedure is easy to misapply when editions mix. This post answers three common questions, then works an example for a steel-frame building. It extends our overview of structural engineering for industrial plants . Steel-frame building under construction. Photo: Dwight Burdette, CC BY 3.0, via Wikimedia Commons . What is the formula for calculating wind load? For a building, the design wind pressure on a surface is p = q G Cp − qi (GCpi), and the force is F = p × A, where A is the tributary area. The velocity pressure follows from wind velocity: qz = 0.00256 Kz Kzt Kd Ke V² in psf with V in mph, or qz = 0.613 Kz Kzt Kd Ke V² in N/m² with V in m/s. Kz is the height exposure coefficient, Kzt the topographic factor, Kd the wind directionality factor, Ke the ground elevation factor (ASCE 7-16 onward), G the gust factor (0.85 for rigid buildings) and Cp the external pressure coefficient. Th...

Pipe Pressure Drop Calculation: Darcy-Weisbach, Friction Factor and Pipe Sizing Worked Example

Image
Pressure drop decides pump head, compressor discharge pressure, fan power and how far a line can run, so it is one of the most frequent calculations in piping design. This post answers the four questions engineers search for most, then works through a water line in Sch 40 steel pipe in SI units with US equivalents. It builds on our post on internal flows . A water distribution pipeline: friction loss along its length sets the pumping head. Photo: iMahesh, CC BY-SA 4.0, via Wikimedia Commons . How to calculate pipe pressure drop? Work through the same steps for any pipe flow: fix the flow rate and fluid properties, find the velocity, find the Reynolds number Re = ρ v D / μ, get the friction factor f, then apply the Darcy–Weisbach equation to the straight pipe and add the minor losses for pipe fittings and valves. Add the static pressure change from elevation, ρ g Δz, to get the total. The friction factor comes from the Moody chart or, more conveniently, from an explicit fit such as...

Saddle Support Design for Horizontal Pressure Vessels: Zick Analysis, Saddle Location and Worked Example

Image
A horizontal pressure vessel is a beam on two supports, with the extra complication that its cross-section is a thin ring that can deform under the support reaction. The Zick analysis is the standard way to check that the shell survives the saddles. This post answers the five questions engineers search for most, then runs a worked example for a horizontal LPG bullet during hydrotest, with checks for the foundation and thermal movement. Horizontal propane storage vessels sitting on fixed supports. Photo: David Pashley, Wikimedia Commons , CC BY-SA 2.0. How to design saddle supports for horizontal vessels? Treat the vessel as a beam on two saddles and design in three steps: find the weight and the saddle reaction, place the saddles, then check the shell stresses with the Zick method. Two saddles are normal, one fixed and one sliding, so the vessel can grow with temperature. This differs from a vertical vessel, which usually stands on a skirt support or legs and is governed by wind a...

Water Hammer Calculation: Joukowsky Equation, Wave Speed and Surge Pressure Worked Example

Image
Water hammer is the pressure surge that follows a sudden change in flow, and it is one of the few piping loads that can exceed the design pressure many times over in a fraction of a second. This post answers the five questions engineers search for most, then works through a DN300 water line with a fast and a slow valve closure and checks the result against the design pressure. It ends with the loads that matter for supports and stress analysis. How to calculate a water hammer? Start with the closure time. A pressure wave travels along the pipe at the wave speed a and returns from the far end after 2L/a, the critical time. If the valve closes in less than this, the closure is rapid and the full Joukowsky surge develops; if it closes more slowly, reflected waves cancel part of the rise and the peak is lower. Joukowsky equation: ΔP = ρ a ΔV, for closure within 2L/a Wave speed: a = √[(K/ρ) / (1 + K D / (E e))], where K is the bulk modulus of the liquid, D the inside diameter, E the...

LMTD Calculation for Heat Exchangers: Correction Factor F and Shell-and-Tube Sizing Worked Example

Image
Every shell-and-tube exchanger is sized against one number: the mean temperature difference that drives heat across the tubes. The log mean temperature difference, with a correction factor for multi-pass layouts, is the standard way to get it. This post answers the five questions engineers search for most, then sizes a one-shell-pass, four-tube-pass oil cooler step by step. It builds on our overview of heat exchangers . A shell-and-tube exchanger bundle being pulled with a bundle extractor. Photo: CEphoto, Uwe Aranas, CC BY-SA 3.0, via Wikimedia Commons . When to use the LMTD method? Use the LMTD method when the inlet and outlet temperatures of both streams are known or fixed by the process, and the unknown is the area. That is the normal situation in exchanger design: the duty Q follows from the flow, specific heat and temperature change, and the area from Q = U A F ΔT lm . When the outlet temperatures are unknown, as when rating an existing exchanger, the NTU method is easier, b...

NPSH Available Calculation: NPSHa Formula, NPSH Margin and Suction Lift Worked Example

Image
Cavitation is one of the most common causes of early pump failure, and it is almost always a suction-side problem. The check is simple in principle: the pressure available at the pump inlet must stay above the pressure at which the liquid begins to vaporise, with enough margin to cover uncertainty. This post answers the five questions engineers search for most, then works through a suction lift example. It builds on our introduction to pumps and turbomachinery . A Warman centrifugal pump; suction-side conditions decide its NPSH available. Photo: Bernard S. Janse, CC BY 2.5, via Wikimedia Commons . What is the formula for calculating the NPSH value? For a pump taking suction from a vessel or sump, the net positive suction head available is the absolute pressure head at the liquid surface, minus the vapour pressure head, plus the static height, minus the suction line losses: NPSHa = (p s − p v ) / (ρ g) + z − h f Here p s is the absolute pressure on the liquid surface (atmospher...

Column Base Plate Design: Bearing Pressure, Plate Thickness and Anchor Rods (AISC Design Guide 1 Worked Example)

Image
A column base plate looks like a small piece of steel, but it has to move the full column load into concrete that is far weaker than the column. If the plate is too small the concrete crushes; if it is too thin the plate bends and the load concentrates under the flanges. This post answers the five questions people search for most, then runs a worked example for a pipe rack column using the AISC Design Guide 1 method. It supports our wider guide to structural engineering for industrial plants . Anchor bolts cast into a concrete foundation. Photo: Zeizmic at English Wikipedia, CC BY-SA 3.0, via Wikimedia Commons . How do I design a steel column base plate? Design follows the load path. First get the factored loads at the column base: axial compression, shear and any bending moment, from combinations such as those in our pipe rack load combinations post. Then size the plate for concrete bearing, find its thickness from plate bending, and design the anchor rods for uplift, shear and ...

Pipe Expansion Loop Design Calculation: Thermal Growth, Loop Sizing and ASME B31.3 Worked Example

Image
Pipes grow when they heat up, and a line held between two anchors has nowhere to put that growth except into stress and anchor load. An expansion loop gives the movement somewhere to go. This post answers the five questions engineers search for most, then sizes a loop for a carbon steel steam line on a pipe rack using the thermal growth equation and the guided cantilever method. An expansion loop in an above-ground pipeline. Photo: Mick Garratt, CC BY-SA 2.0, via Wikimedia Commons . How do I calculate the size of an expansion loop for a pipe? Work in three steps. First find the thermal growth between anchors, then choose the leg length that absorbs it within the allowable stress range, then check the result in a pipe stress model. The same method applies to steam piping and other steel pipes; copper pipe and PVC or CPVC plastic pipe follow the same equations with different expansion coefficients, moduli and allowable stresses. Thermal growth: ΔL = α L ΔT Guided cantilever leg:...

Solar Panel Row Spacing Calculation: Inter-Row Shading, Tilt Angle and Ground Coverage Ratio Worked Example

Image
Row spacing is a trade between two losses: rows packed too tightly shade each other and cost energy, while rows spread too far apart waste land or roof area. The calculation is geometry plus one judgment, the design hour for which shading is accepted. This post answers the four questions people search for most about solar panel layout, then works through a full example at 40° north. It supports our wider guide to solar PV engineering design and yield . Rows of ground-mounted solar panels. Photo: Neil Owen, CC BY-SA 2.0, via Wikimedia Commons . How to calculate row spacing? Row spacing starts with the sun at the worst time you are willing to accept. For a south-facing array in the northern hemisphere, that is the winter solstice, with declination δ = −23.45°, at a design hour such as 9:00 and 15:00 solar time. The sun is lowest and the shadows longest then, so a layout that is clear at that hour is clear for the rest of the year at those times. The key equations are: Solar alt...

Pressure Vessel Shell Thickness Calculation: ASME VIII Div. 1 UG-27 Formula and Worked Example

Image
Shell thickness is the first number on a pressure vessel data sheet, and almost every other dimension follows from it: plate cost, weld volume, nozzle reinforcement and the weight on the foundation. ASME Section VIII Division 1 sets the rules through the UG-27 formulas, which apply to shells under internal pressure. This post answers the four questions engineers search for most, then works through a full example. It sits alongside our wider guide to pressure vessel and storage tank design . A pressure vessel used in industry. Photo: Exit2dos2000, CC BY-SA 3.0, via Wikimedia Commons . How to calculate shell thickness of pressure vessel? Start from thin-walled pressure vessel theory. Internal pressure P in a cylinder of radius R and wall t creates a hoop stress σ h = P R / t and a longitudinal stress of half that, σ L = P R / (2t). The radial stress, falling from −P inside to zero outside, is small by comparison and is neglected. Hoop stress is larger, so it normally sets the thic...